Completed Works

Project: ID Fan Solution

Client: Mitsui Copper Foil (M) Sdn Bhd

Scope of work:
BAF Fan Overhaul

  • Dismantle of Fan & Impeller
  • Dismount of bearings & Inspect shaft housing

  • Dynamic Balancing of the fan impeller

  • Mount bearing & Assemble heating insulators

  • Final Assembly & Painting

  • 1 Supervisor
  • 5 Workers involved.

Project: Cooling Tower Solution

Client: Polyfelt Asia (M) Sdn Bhd
Duration: Completed in 4 days

Scope of work:

  • Remove fan, housing, bearing and pulleys from the tower

  • Install new bearing & Modify casing for Auto Lubrication

  • Clean, paint and assemble the unit

  • Dynamic balancing & Test Run

  • Final Report generation

  • 1 Engineer — Project / Site / Supervision
  • 1 Engineer — Vibration Analysis / Report
  • 5 Skilled Technicians

Project: Vibration Sensor & Precision Alignment

Client: Combat Engineering (M) Sdn Bhd
Duration: 1 Month Contract

Scope of work:

  • Fit Auto Lubricator & set per Dial Set program

  • Align motor pulley to fan pulley using Laser Equipment

  • Copper tube installation for grease escape

  • Sensor and wiring installation commissioning

  • Drill hole & tap M* on horizontal position of housing

  • 1 Engineer
  • 4 Skilled Technicians 

Project: Industrial Gear Box Solution

Client: Samsung Corning (M) Sdn Bhd
Duration: 5 Days

Scope of work:

  • Dismantle Gear Box & Install Bearing (Induction Heater)

  • Install Oil Seal, Speedy Sleeve & Oil Leveller

  • Rebuild Shaft & Precision Machinery of Worm Gear

  • Vibration Analysis (6 times) & Temperature Monitoring

  • Oil Analysis (3 times) & Heat treatment of output shaft

  • 1 Engineer — Installation Supervision / Monitoring
  • 1 Engineer — Vibration Analysis
  • 2 Skilled Technicians per day

    Project: On-site Dynamic Balancing

    Client: Shell Refining Company (Federation of Malaysia) Berhad, Port Dickson
    Contract Duration: 3 years ++

    Scope of work:

    • Monthly Condition Based Monitoring of site equipment and machinery.

    • Vibration Analysis of rotating assets.

    • Thermography of pipelines and electrical systems.

    • Motor Current Survey for motor health diagnostics.

    • Pre-shutdown & Post-shutdown technical inspections.

    • 1 Technical Manager
    • 2 Vibration Specialists
    • 1 Chargeman

      Project: Precision Shaft Alignment of Pumps & Motors

      Client: Uniqema (M) Sdn Bhd

      Scope of work:

      • Supply of Laser Equipment

      • Supply of Shims

      • Professional Services

      • Supply of Mechanical Tools

      • Transportation

      • Report

      • 1 Engineer for Vibration Analysis/Report
      • 1 Skilled Technician

      Project: Thermography

      Client: MAPA
      Contract Duration: 1 year

      Scope of work:

      • Supply of Thermal Imager

      • Professional Services

      • Mobilisation & Report Writing

      • 1 Thermographic Specialist for Analysis & Report Writing
      • 1 Skilled Technician to assist in Imaging

      Project: Vibration Analysis

      Client: Nestle Foods (M) Sdn Bhd

      Scope of work:

      • Vibration Analysis for Decanter and Blower Fan

      • Transient Analysis for Blower Fan to detect any natural frequency

      • Transportation

      • Report

      • 1 Engineer

      Project: Precision Alignment and Vibration Analysis on Primary Crusher and its Conveyor System

      Client: Puchong Quarry Sdn Bhd
      Contract Duration: 1 month

      Scope of work:

      • Vibration Analysis: Performed on the Primary Crusher, Conveyor System, Motors, and Head Drum.

      • Precision Belt Alignment: Completed using Laser Equipment on Primary Crusher Pulleys and Conveyor Motor Pulleys.

      • Auto Lubrication: Supply and installation of auto lubrication for the Head Drum.

      • 2 Engineers.
      • 2 Skilled Technicians.

      Project: Precision Cleaning of Kuster Press Machine

      Client: Donghwa Fibreboard Sdn Bhd
      Contract Duration: 2 Shifts (12 days)

      Scope of work:

      Cleaning Service of Kuster Press Machine components:

      • Main Roller

      • Hydraulic System

      • Intermittent rollers

      • Conveyors

      • Bottom room

      • Platform

      • Corridors

      • 2 Supervisors
      • 20 Skilled Technicians
      • Organized into 2 shifts

      Project: Overhaul of GAH Drive gear

      Client: Kapar Energy Ventures Sdn Bhd (TNB Generation – Kapar)
      Contract Duration: 1 month

      Scope of work:

      • Dismantle the gear from site and dismantle gear components

      • Dismount and mount bearing and gear wheel

      • Clean and inspect all parts

      • Assemble gear and reassemble at site

      • Final alignment

      • 1 Supervisor
      • 4 Skilled Technicians
        Schedule: 12 hours / day for 15 days

      Project: Predictive Maintenance Training

      Client: Kapar Energy Ventures Sdn Bhd (TNB Generation – Kapar)
      Contract Duration: 2 weeks

      Scope of work:

      • Predictive Maintenance Training: Includes Introduction to Maintenance Philosophy and other Predictive Maintenance Techniques.

      • Vibration Basics: Introduction to vibration, Positioning/Naming, Amplitude, Measuring Vibration, and Database setup.

      • Advanced Techniques: Enveloping and Time synchronous averaging.

      • Hands-on Training: Practical sessions using a demo kit.

      • Core Component Introductions: Introduction to Bearings, Lubrication, Precision Alignment, and Balancing.

      • 2 Trainers
      • Schedule: 2 sessions, with each session lasting 2 1/2 days.